
Structural assembly
Fabricated frames, housings and supporting sections are joined into the required structure.
Key equipment: TIG, laser and robotic welding resources support fabricated structures.
Metal structures, machined parts and hose systems assembled into finished equipment modules.

Manufacturing processes

Fabricated frames, housings and supporting sections are joined into the required structure.
Key equipment: TIG, laser and robotic welding resources support fabricated structures.

Parts and mounting hardware are fitted together, with checks for alignment, fit and function.
Key equipment: Assembly workstations supported by in-house machining and fabrication.

Hose, fitting and duct connections are integrated with the surrounding metal structure and equipment interfaces.
Key equipment: Hose cutting and crimping resources: Q-51 and KBX-120; product-specific assembly fixtures.
| Equipment | Models / resources | Purpose |
|---|---|---|
| Fabrication and machining | DM1370; EV850; BDC2500; CNC lathes and laser cutters | Producing frames, housings and interfaces. |
| Joining and fitting | FD-V25H; TIG and laser welding equipment; assembly workstations | Building structures and integrating components. |
| Inspection and testing | TPU-02-100-2B; HD-B604-S; R-TS-223S | Checking applicable assembly functions. |
Fabricated metal parts · Machined components · Hose and duct systems · Customer-specified or approved purchased components
The strongest fit is a repeatable industrial project that combines several processes. Project size can range from compact components to large assemblies. Large assemblies require a review of the customer drawings, materials, handling and test requirements before quotation.
Precision & quality control
We check critical dimensions, component fit and the finished work against the drawing and inspection plan.
View inspection controls & certificatesCertificates support their stated management or process scope. Tolerances and acceptance criteria are confirmed for each part.
Yes. Start with the application, approximate size, material and quantity. Detailed drawings can follow when you are ready for a technical review.
Discuss your projectChinese original inspection and test reports with English translations are available on request. The report scope and acceptance criteria are agreed before production.
Quality documentationYes. We welcome your nominated inspection organization and agree the inspection scope and timing in advance.
Inspection arrangementsTell us what you need. Drawings and technical details can follow.